Chilime Hydropower Plant


 

GENERAL INFORMATION

 

The Chilime Hydropower Plant is a peaking run off river type plant constructed and owned by Chilime Hydropower Company Limited. It is located at 133 km north of Kathmandu at the right bank of Bhotekoshi River in Rasuwa District. The plant with the installed capacity of 22.1 MW is delivering power to the National Grid through a 38 km long 66 kV single circuit transmission line at Trisuli Power House Switchyard at Trishuli, Nuwakot. 

The electricity generated from the power plant is purchased by NEA at the powerhouse and evacuated as per the PPA made on June 25, 1997 and its first amendment made dated December 10, 2007. The annual deemed energy salable to NEA is 132.918 GWh, excluding penalty-free outage of 720 MWh (36hours) annually.

The plant has started its commercial generation from 00:00 hours of 8th Bhadra 2060 (24th August 2003). During nine years of its operation, the plant has been operating successfully.

 

 

Generation statistics of the Plant

 

Fiscal Year  

Deemed Generation (MWh)

Transmitted Metered Energy(MWh)

Chargeable Energy (MWh)

2060/061

115198

113810

109142

2061/062

132758

131568

124484

2062/063

133225

139669

136322

2063/064

132796

144583

139651

2064/065

132068

141176

138400

2065/066

132769

144501

142138

2066/067

133239

148132

141565

2067/068

132795

150110

142865

2068/069

132795.33

156083

147580.51

2069/070

132757.8

154019

150500

2070/071

130048.7

151390

141113.2

2071/072

212582.4

147478

145238.8

2072/073

132073.9

154764.6

154764.5

2073/074

134758

146412.8

145214.5

2074/075

117093.6

149289.3

147899.9

SALIENT FEATURES


River

Chilime Khola.

Type of scheme

Run of river with peaking pondages

Turbine discharge

7.5m^3/s

Gross head

351.5 m

Net head

337.46 m

Installed capacity

22.1 M W(2*11.05 M W)

Average annual energy

137.9 GWh (137 million units)

Deemed energy

132.9 GWh(132 million units)

Intake size

2*5.50 m*1.2 m

Diversion Weir( L*H)

13 m*3.25 m

Sluiceway Width

3.0m

Desanding Basin Type

Dufour (Double Chamber)

Desanding Basin Dimension (L*B*H)

60 m* 7.5 m*3.75 m

Syphon (L*D)

58 m*2.2 m (Steel Pipe)

Power Canal (L*B*H)

606 m* 2.2 m* 2.2 m

Feeder canal with Bemdang khola (L)

82.15 m

Peaking pondage Storage Capacity

53032 m^3

Pressure Conduit (L)

414 m

Headrace Tunnel (L)

2826.5 m

Underground Surge tank (D* H)

6.5 m*33 m

Underground Penstock (L*D)

635.5 m*1.64 m to 2.17 m

Transformer Cavern (L*W*H)

67 m*10 m* 7.5 m

Switchgear Room (L*W*H)

14 m* 12 m*8.5 m

Powerhouse Cavern (L*W*H)

40 m to 50 m *16 m* 16.5 m

Tailrace tunnel (L*W*H)

243 m* 3 m* 3 m

Turbine (Type & output)

Horizontal, Pelton (2*11.28 MW) Digital Governor

Generators (Type, Capacity & Voltage)

Brushless Excitation, 13 MVA, 11 KV

Transformers (Type, Capacity & Voltage)

Single Phase, 4.25 MVA * 7 Nos.

Switch gear Type

Gas Insulatyed Metal Clad (GIS System)

Transmission Line (L*V & Circuit)

38 KM * 66 KV Single Circuit (Wolf Conductor)

Performance & Summary


PERFORMANCE OF PLANT

 

The power plant has very efficient and robust electromechanical equipments, as a result, the plant is able to generate 13.8% excess energy in addition to the deemed energy as per the Power Purchase Agreement with Nepal Electricity Authority. In fiscal year 2067/068, the plant has been successful in delivering chargeable deemed energy 132.79 Gwh, chargeable excess energy of 10.07 Gwh and free excess energy 8.26 Gwh. Insurance of the plant has been made with Rastriya Beema Sansthan.

 

 

SUMMARY OF PLANT STATUS

 

The hydraulic structures of the plant are in good condition and major repair works have not been required so far. The main equipments have proven to be robust and the whole electromechanical system design has proven to be effective and as per the conditions and practices of the Nepalese system. It is seen from the data that the generation from the plant, for last seven years, has been fairly higher than the deemed generation.

Improvement in the system such as cooling water system, intake trash rack, desander flushing, reservoir flushing, etc., has contributed to the high availability of the plant. As a result the plant has been able to generate excess energy besides deemed energy from the 2nd year of its generation.

 